fix(deps): update rust crate actix-http to v3.9.0 #143

Merged
realaravinth merged 2 commits from renovate/actix-http-3.x-lockfile into master 2024-08-13 15:31:44 +05:30
Member

This PR contains the following updates:

Package Type Update Change
actix-http (source) dependencies minor 3.8.0 -> 3.9.0

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [actix-http](https://actix.rs) ([source](https://github.com/actix/actix-web)) | dependencies | minor | `3.8.0` -> `3.9.0` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOC4yMy4zIiwidXBkYXRlZEluVmVyIjoiMzguMjMuMyIsInRhcmdldEJyYW5jaCI6Im1hc3RlciIsImxhYmVscyI6WyJyZW5vdmF0ZS1ib3QiXX0=-->
renovate-bot added the
renovate-bot
label 2024-08-10 08:06:19 +05:30
renovate-bot added 1 commit 2024-08-10 08:06:19 +05:30
fix(deps): update rust crate actix-http to v3.9.0
All checks were successful
ci/woodpecker/pr/woodpecker Pipeline was successful
c1db73984c
realaravinth added 1 commit 2024-08-13 15:31:00 +05:30
Merge branch 'master' into renovate/actix-http-3.x-lockfile
All checks were successful
ci/woodpecker/pull_request_closed/woodpecker Pipeline was successful
ci/woodpecker/pr/woodpecker Pipeline was successful
193b9037b5
realaravinth merged commit 634075240c into master 2024-08-13 15:31:44 +05:30
Sign in to join this conversation.
No description provided.