chore(deps): update dependency @types/node to v20.17.10 #17

Merged
realaravinth merged 1 commit from renovate/node-20.x-lockfile into woodpecker-pipeline 2024-12-30 18:47:14 +05:30
Member

This PR contains the following updates:

Package Type Update Change
@types/node (source) devDependencies minor 20.8.9 -> 20.17.10

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [@types/node](https://github.com/DefinitelyTyped/DefinitelyTyped/tree/master/types/node) ([source](https://github.com/DefinitelyTyped/DefinitelyTyped/tree/HEAD/types/node)) | devDependencies | minor | [`20.8.9` -> `20.17.10`](https://renovatebot.com/diffs/npm/@types%2fnode/20.8.9/20.17.10) | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOS44Ni4xIiwidXBkYXRlZEluVmVyIjoiMzkuODYuMSIsInRhcmdldEJyYW5jaCI6Indvb2RwZWNrZXItcGlwZWxpbmUiLCJsYWJlbHMiOlsicmVub3ZhdGUtYm90Il19-->
chore(deps): update dependency @types/node to v20.17.10
Some checks failed
renovate/artifacts Artifact file update failure
ci/woodpecker/push/woodpecker Pipeline was successful
ci/woodpecker/pr/woodpecker Pipeline was successful
ci/woodpecker/pull_request_closed/woodpecker Pipeline failed
Lint / fmt (pull_request) Has been cancelled
Lint / clippy (pull_request) Has been cancelled
Build / stable - x86_64-unknown-linux-gnu (pull_request) Has been cancelled
2b6f039dd4
Author
Member

⚠️ Artifact update problem

Renovate failed to update an artifact related to this branch. You probably do not want to merge this PR as-is.

♻ Renovate will retry this branch, including artifacts, only when one of the following happens:

  • any of the package files in this branch needs updating, or
  • the branch becomes conflicted, or
  • you click the rebase/retry checkbox if found above, or
  • you rename this PR's title to start with "rebase!" to trigger it manually

The artifact failure details are included below:

File name: yarn.lock
Unknown Syntax Error: Unsupported option name ("--ignore-platform").

$ yarn install [--json] [--immutable] [--immutable-cache] [--refresh-lockfile] [--check-cache] [--check-resolutions] [--inline-builds] [--mode #0]

### ⚠️ Artifact update problem Renovate failed to update an artifact related to this branch. You probably do not want to merge this PR as-is. ♻ Renovate will retry this branch, including artifacts, only when one of the following happens: - any of the package files in this branch needs updating, or - the branch becomes conflicted, or - you click the rebase/retry checkbox if found above, or - you rename this PR's title to start with "rebase!" to trigger it manually The artifact failure details are included below: ##### File name: yarn.lock ``` Unknown Syntax Error: Unsupported option name ("--ignore-platform"). $ yarn install [--json] [--immutable] [--immutable-cache] [--refresh-lockfile] [--check-cache] [--check-resolutions] [--inline-builds] [--mode #0] ```
realaravinth merged commit 22bd14056c into woodpecker-pipeline 2024-12-30 18:47:14 +05:30
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
mCaptcha/mCaptcha!17
No description provided.