fix a bug from #30490
`prs.GetIssueIDs()` will also be used in other places, e.g.
`InvalidateCodeComments`
so we should not add `if pr.Issue == nil` in it, or if `pr.Issue` is
already loaded, you will not get the issueID in the results list and
this is not an expected result.
So this will caused a bug:
before calling `InvalidateCodeComments`, all `pr.Issues` in `prs` are
loaded, so `issueIDs` in this function will always be `[]`.
![image](https://github.com/go-gitea/gitea/assets/18380374/ef94d9d2-0bf9-455a-abd6-4d5e6497db7c)
(cherry picked from commit e61e9a36b7117bab2cb122a95d606a86527ed45d)
Enable [unparam](https://github.com/mvdan/unparam) linter.
Often I could not tell the intention why param is unused, so I put
`//nolint` for those cases like webhook request creation functions never
using `ctx`.
---------
Co-authored-by: Lunny Xiao <xiaolunwen@gmail.com>
Co-authored-by: delvh <dev.lh@web.de>
(cherry picked from commit fc2d75f86d77b022ece848acf2581c14ef21d43b)
Conflicts:
modules/setting/config_env.go
modules/storage/azureblob.go
services/webhook/dingtalk.go
services/webhook/discord.go
services/webhook/feishu.go
services/webhook/matrix.go
services/webhook/msteams.go
services/webhook/packagist.go
services/webhook/slack.go
services/webhook/telegram.go
services/webhook/wechatwork.go
run make lint-go and fix Forgejo specific warnings
* Split TestPullRequest out of AddTestPullRequestTask
* A Created field is added to the Issue table
* The Created field is set to the time (with nano resolution) on creation
* Record the nano time repo_module.PushUpdateOptions is created by the hook
* The decision to update a pull request created before a commit was
pushed is based on the time (with nano resolution) the git hook
was run and the Created field
It ensures the following happens:
* commit C is pushed
* the git hook queues AddTestPullRequestTask for processing and returns with success
* TestPullRequest is not called yet
* a pull request P with commit C as the head is created
* TestPullRequest runs and ignores P because it was created after the commit was received
When the "created" column is NULL, no verification is done, pull
requests that were created before the column was created in the
database cannot be newer than the latest call to a git hook.
Fixes: https://codeberg.org/forgejo/forgejo/issues/2009
The fix against the race incorrectly assumes the sha of the commit being
pushed belongs to the base repository. It finds the highest possible
pull request ID from the head repository instead of looking it up in
the base repository.
Figuring out if a PR was created in the future based on the highest
index of the base repository would require collecting all of them
because there is no way to know in advance which repository may be
involved in the race.
Fixing this race can be done either by:
* Introducing a new field in the pull_request table https://codeberg.org/forgejo/forgejo/pulls/2842
which feels more like a hack than a real solution
* Refactoring the logic
which would be a significant undertaking
The race has been in the codebase for a very long time and manifests
itself in the CI, when events happen in quick succession. The only
concrete manifestation was however fixed by https://codeberg.org/forgejo/forgejo/issues/2009
Since this race now only exists in theory and not in practice, let's
revert this bugous commit until a proper solution is implemented.
Fixes: https://codeberg.org/forgejo/forgejo/issues/2817
This reverts commit 036f1eddc5.
Conflicts:
services/pull/pull.go
This PR will avoid load pullrequest.Issue twice in pull request list
page. It will reduce x times database queries for those WIP pull
requests.
Partially fix #29585
---------
Co-authored-by: Giteabot <teabot@gitea.io>
(cherry picked from commit 62f8174aa2fae1481c7e17a6afcb731a5b178cd0)
Conflicts:
models/activities/notification_list.go
moved to models/activities/notification.go
* Split TestPullRequest out of AddTestPullRequestTask
* Before scheduling the task, AddTestPullRequestTask stores the max
index of the repository
* When the task runs, it does not take into account pull requests that
have an index higher than the recorded max index
When AddTestPullRequestTask is called with isSync == true, it is the
direct consequence of a new commit being pushed. Forgejo knows nothing
of this new commit yet. If a PR is created later and its head
references the new commit, it will have an index that is higher and
must not be taken into account. It would be acting and triggering a
notification for a PR based on an event that happened before it
existed.
Refs: https://codeberg.org/forgejo/forgejo/issues/2009
Reviewed-on: https://codeberg.org/forgejo/forgejo/pulls/2236
Reviewed-by: Gusted <gusted@noreply.codeberg.org>
Co-authored-by: Earl Warren <contact@earl-warren.org>
Co-committed-by: Earl Warren <contact@earl-warren.org>
(cherry picked from commit b3be895a30b32bfae4acfa32db54406e1dd1dc21)
To avoid deadlock problem, almost database related functions should be
have ctx as the first parameter.
This PR do a refactor for some of these functions.
This PR
- [x] Move some code from `issue.go` to `issue_search.go` and
`issue_update.go`
- [x] Use `IssuesOptions` instead of `IssueStatsOptions` becuase they
are too similiar.
- [x] Rename some functions
Close #24213
Replace #23830
#### Cause
- Before, in order to making PR can get latest commit after reopening,
the `ref`(${REPO_PATH}/refs/pull/${PR_INDEX}/head) of evrey closed PR
will be updated when pushing commits to the `head branch` of the closed
PR.
#### Changes
- For closed PR , won't perform these behavior: insert`comment`, push
`notification` (UI and email), exectue
[pushToBaseRepo](7422503341/services/pull/pull.go (L409))
function and trigger `action` any more when pushing to the `head branch`
of the closed PR.
- Refresh the reference of the PR when reopening the closed PR (**even
if the head branch has been deleted before**). Make the reference of PR
consistent with the `head branch`.
When a change is pushed to the default branch and many pull requests are
open for that branch, conflict checking can take some time.
Previously it would go from oldest to newest pull request. Now
prioritize pull requests that are likely being actively worked on or
prepared for merging.
This only changes the order within one push to one repository, but the
change is trivial and can already be quite helpful for smaller Gitea
instances where a few repositories have most pull requests. A global
order would require deeper changes to queues.
Should call `PushToBaseRepo` before
`notification.NotifyPullRequestSynchronized`.
Or the notifier will get an old commit when reading branch
`pull/xxx/head`.
Found by ~#21937~ #22679.
Co-authored-by: Lunny Xiao <xiaolunwen@gmail.com>
Change all license headers to comply with REUSE specification.
Fix #16132
Co-authored-by: flynnnnnnnnnn <flynnnnnnnnnn@github>
Co-authored-by: John Olheiser <john.olheiser@gmail.com>
This PR adds a context parameter to a bunch of methods. Some helper
`xxxCtx()` methods got replaced with the normal name now.
Co-authored-by: delvh <dev.lh@web.de>
Co-authored-by: Lunny Xiao <xiaolunwen@gmail.com>
* Move access and repo permission to models/perm/access
* fix test
* fix git test
* Move functions sequence
* Some improvements per @KN4CK3R and @delvh
* Move issues related code to models/issues
* Move some issues related sub package
* Merge
* Fix test
* Fix test
* Fix test
* Fix test
* Rename some files